What Punch List Means?

What is the difference between snag list and punch list?

A snag list, which is also sometimes referred to as a snagging report, is a list of all the items that need to be completed, fixed, re-done, or addressed before a construction project is finished.

You may have also heard this referred to a punch list.

It’s a very important step in the construction project process..

What is a project Punchlist?

A punch list is part of the project closeout portion of the construction process in which a contractor prepares a document that lists any work that has not been completed, or not been completed correctly.

Who determines what method of delivery is used on a project?

3.5 Green project delivery systems The most appropriate green project delivery system is determined by the owner during the concept Design Phase. Each delivery system has its characteristic advantages and disadvantages depending on the type and size of the project under consideration.

Is punch list one word?

A punch list is an accounting of incomplete or poorly executed items on a construction project. … Punch list is primarily an American term, sometimes the hyphenated punch-list is found.

What is a back punch?

The Back Punch, as it became known throughout the Westindian community of working people, was the process of drawing spinal fluid from these tough, hard working and loyal laborers who, despite institutional obstacles, Jim Crow hurdles thrown in their path, low pay and rigorous working conditions, were still strong in …

What is a punch list quizlet?

Punch List. The minor adjustments, repairs, and work items that must be done before. substantial completion can be achieved. The list is prepared jointly by the owner, architect, and. contractor.

Why is it called a punch list?

The phrase takes its name, under one hypothesis, from the historical process of punching a hole in the margin of the document, next to one of the items on the list. This indicated that the work was completed for that particular construction task.

What does General conditions mean in construction?

General conditions are the costs incurred during a project that generally don’t involve swinging a hammer or installing something permanently in your home. … They fall roughly into three categories: site management, material handling and project management.

What is the role of the owner on a construction project quizlet?

The role of the owner on a construction project is to develop the program for the building, define the scope of the project, create the budget, and provide the funding for the project. … It is a rating system that evaluates a building’s environmental performance over its life cycle.

What should I look for in a new construction walkthrough?

What should be on your final walk through checklist:Bring all the essentials. … Verify final repairs. … Check for all items included in the sale. … Open windows and doors. … Carefully inspect the bathrooms. … Review the condition of the kitchen, too. … Test all the appliances. … Try out the heating and air conditioning.More items…

What is a punch list example?

Examples of punch list items include: repair broken window. replace stained wallboard. repair cracked paving.

How do you make a punch list?

How To ensure a Punch List is completed:Be present near the end of the project. Inspect the work. Ask questions.Consult. Have an eye for detail. Be prepared and helpful.Get it done. Follow-up. Communicate changes in scope.Design Intent. Confirm what was built.

What should I look for in a punch list?

It’s usually prepared towards the end of a construction project and documents all the work that doesn’t conform to the contract provisions. The punch list could include things like incorrect installations (flooring, cabinetry), or incidental damage to existing finishes (floors), material and structures.